Receiving Inspection
2021-02-12
来源:易榕旅网
Receiving Inspection R/Y/G Status(C/O:Requirement1. Time and Data ManagementQuality Work Elements1.1 Assure meetings are organized and scheduled consistently withTime & Data Management meeting requirements Prescribed frequencies for meetingsv Incoming Supplier Quality Meeting (A15) – Monthly Review of required attendee schedules1.2 Appropriate participants attend the designated Time & DataManagement meetings Participation by appropriate attendants (sign-insheets)1.3 Information to be Reviewed is met Use of metrics/quality indicators Analyze data to focus resources on customerconcerns1.4 Strategic Intent is met Assignments include timing, actions, andresponsibilities Actual meeting content aligns with strategic intentStatusCorrectiveActionRespoinsibilityDueDate2. Incoming MaterialQuality Work Elements Conduct quality supplier meetings at lead plant with sister plant supportCovered under Time & Data Management2.1 Receiving inspection responds to supplier issues Sort non-conformities to protect productionContainment Action for Non-Conformities Local procedurev Roles and responsibilities to respond toproduction quality concerns2.2 For nonconforming parts, notify suppliers, sister plants, STA andPurchasing: input concern to material rejection system (QR2) Responsible to open a Concern Report (CR) Responsible to \"bin\" the CR according to theappropriate activity responsible (assembly plant,carrier, design or supplier) Responsible to enter QR's, DR's, PP's and TR'sinto the QR2 database Authority to rescind a QR2.3 Assure containment action plans are adequate Responsible for prompt identification, tagging andsegregation of damaged material Designated storage or holding areas for defectiveand suspect material shall be clearly marked and easilydistinguishable Reaction plan for supplier notified quality concerns System to have certified parts supplied whensupplier at fault2.4 Support/reject Q1 Endorsement for suppliers, with dataPlant shall also use this data as input to production part sourcingdecisions Responsible to endorse suppliers for Q12.5 Manage scrap-sorting process Local procedure defining scrap handling process Required records2.6 Perform inspection on each shipment of gasoline, transmissionfluid, brake fluid, power steering fluid, diesel, anti-freeze and greaseprior to unloading. Assure bulk materials are used on first-in first-outbasisContainment Action for Material Inspection Must achieve requirements identified in VOP QUN-236and VOP QUG-205 Data up-to-date, available for all shifts, andperformed at the frequency specified (log form,electronic record or other suitable form) Containment/reaction plans followed Retain documentation of the following quarterly records:v Damaged Material Reportsv Incoming material accumulated rejectionsv Incoming material shipment rejections Covered by ISO 90003. Tool VerificvationQuality Work Elements3.1 Conduct initial tooling/test equipment and gage certification.Assure calibration devices can be traced to National Standards.Maintain records Local procedure/FAP 03-015 Unique identification Calibration/certification/verification frequency Method for calibration Traceability to National Standards3.2 Conduct required gage and measurement studies Measurement study results (Gage R&R) Perform plant build verification and tool prove-out (Ppk) inconjunction with early pre-production buildsCovered by APQP3.3 Conduct ongoing checks:v Gages, fixtures, hand applies and other templates Gage calibration/certification status Schedule to ensure the periodicchecks/calibration of Inspection Measuring TestEquipment (IMTE) Instructions are maintained to ensure theproper use and operation of the IMTE3.4 Process test equipment Gage calibration/certification status New Inspection Measure & Test Equipment(IMTE) is calibrated/certified prior to use Instructions are maintained to ensure the proper use andoperation of the IMTE Develop PM schedules for new and revised toolingCovered by FPS –ISR Conduct torque process potential studies on mandatory and non-mandatory operationsCovered by Torque Assurance Program